# Provenance, assumptions and release scope

## Dataset provenance

* The `Elements` data originate from the case-study tender design BIM quantity record. Descriptions, geometry-derived quantities, concrete specifications, local identifiers and declared pour-group assignments are retained for computational traceability. The original BIM/IFC geometry is not distributed.
* The `Plants` and `Prices` tables combine anonymised physical plant records, supplied routes/tariffs and the specified 2026 economic assumptions. Assignment of 12 plants to an `internal/producer` role is a **hypothetical contractor access and transfer-price scenario**; the roles are not proof of ownership.
* The `Benchmarks` data identify selected public price-list sources. External RAC price models use a published absolute price benchmark or transfer of a published matched NAC–RAC price difference. Evidence/status columns identify the input interpretation.
* The `Scenarios` table contains deterministic parameter variations, including premiums, quantity/transport changes, and supply eligibility diagnostics.
* S2 is computed from S1 through the Python model in S3. The case input and output workbooks are readable exports; the executable model takes CSV/JSON inputs contained within S3.

## Key design assumptions

- 394 BIM demand records grouped in 85 predefined pour groups; one supplier and mixture per group.
- Project net concrete demand: 2,337.2662 m³; procurement demand with 5% allowance: 2,454.12951 m³.
- Base capacity per mixer truck delivery: 7.5 m³, giving 369 deliveries for the predefined groups.
- 60 anonymised physical plants; 48 external purchase candidates and 12 internal transfer-price candidates.
- 2,191 computational scenario records; 242 common-premium cases and 1,922 independent-premium cases alongside 27 other scenarios.
- Supplier product certification and the technical RAC application screen are distinct attributes. Potential RAC share under the technical screen is 40.90%; selected RAC concrete share in the main price benchmark scenario is 8.90%.
- The baseline cost is EUR 329,939.39, with prices reported in EUR, excluding VAT. The associated NAC-only comparison is EUR 331,174.58.
- No project minimum RAC quota, shared supplier capacity constraint, fleet scheduling or physical dispatch sequence is imposed. The optimisation is an exact minimum within the stated separable alternatives.
- `ConcreteProcurementRecord` is a proposed IFC property-set name used by the optional mapping/writeback prototype. Project-specific exchange uses externally verified GlobalIds and a separate IFC test.

## Release review before publication

1. Confirm rights to publicly release the derived BIM element descriptions, data extracted from project documentation and locally identifiable source information.
2. Confirm the right to redistribute supplied commercial supplier prices and transport assumptions, including their derived or anonymised forms.
3. Assess the 60 exact latitude/longitude pairs. The values can identify suppliers even where names are replaced by numeric IDs. If disclosure is not authorised, consider restricted access or an appropriately transformed public dataset, and rerun the model after any changes.
4. Decide the data and software licences with relevant rights holders. Zenodo's default licence selection should not be taken as evidence that all external material can be sublicensed.
5. Link the final journal DOI after publication, preferably in Zenodo *Related works* using an appropriate supplement relation.

These checks relate to legal and data stewardship questions rather than numerical validity. The release files in this package are unmodified copies of the audited S1–S3 files, with additional documentation only.